Home / All / Aluminum coated silicon / Aluminized Steel Coil RFQ Checklist: 12 Specs to Specify
Can't find what you are looking for?providing the solution of the industrial raw materials based on the steel
Pre-Painted Galvanized steel,Aluminized steel,Galvanized steel,Zinc Aluminum Magnesium steel,Galvalume steel,Cold Rolled Steel
Contact us for free modeling
Just fill-in the form below and we will response to you within 12 hours.
*Email
Phone
*Title
*Content
Upload
  • Only supports .rar/.zip/.jpg/.png/.gif/.doc/.xls/.pdf, maximum 20MB.

Aluminized Steel Coil RFQ Checklist: 12 Specs to Specify

Nov 13,2026

(English, publish-ready)

Two buyers can request the same product and receive two completely different quotations. One writes "aluminized steel coil, 1.0 mm, 20 tons". The other writes a twelve-line specification covering standard, type, coating designation, base grade, tolerances, coil geometry, surface, edges, quantity, documents, packing and delivery terms. The first buyer will get a price that cannot be compared with anyone else's; the second will get three comparable offers. This aluminized steel coil RFQ checklist is the exact list of aluminized steel coil specifications we ask customers to confirm before we issue a quotation.

Why an incomplete RFQ costs more than the steel

An underspecified RFQ is not merely an administrative problem. Missing fields migrate into the purchase order, the mill certificate and eventually the dispute:

  • No coating designation → the supplier defaults to the cheapest available coating for the type.
  • No thickness basis → substrate thickness and total coated thickness differ by the coating mass.
  • No edge condition → slit edges arrive with burrs or unprotected cut steel that corrodes first.
  • No inspection document → there is no baseline for a claim if the coating mass is short.
  • No Incoterms → a "per ton" price is not comparable across suppliers at all.

The checklist below is ordered the way a mill reads an order, not the way a purchasing form is usually laid out.

The 12 specifications to state in every RFQ

#FieldWhat to writeWhat goes wrong if omitted
1Standard and typeASTM A463 Type 1 or Type 2; state the standard editionType 2 quoted for a heat application; wrong product entirely
2Coating designationT1-25, T1-40, etc., or the agreed AS code — never bothCoating mass defaults to the mill's stock grade
3Base steel gradeGrade plus forming requirement (drawing / bending / stamping)Cracking during forming, or an over-specified expensive grade
4Thickness and toleranceValue, tolerance, and whether measured on substrate or coated total0.05 mm dispute across an entire coil
5Width and toleranceValue, tolerance, and slit-width count if applicableYield loss at the customer's line
6Coil geometryInner diameter, outer diameter, maximum coil weightCoil will not fit the decoiler
7Surface conditionOiled / dry, surface finish, passivationStaining in transit or incompatible downstream painting
8Edge conditionMill edge or slit edge; burr limit; edge protectionCut-edge corrosion and handling damage
9Quantity and toleranceTonnage, MOQ, and ±% tolerance on delivered quantityShort shipment disputes; MOQ repricing
10Inspection documentsMTC type, coating mass entry, third-party inspection if requiredNo evidence if the coating is under specification
11Packing and markingExport seaworthy packing, coil orientation, label contentTransit damage, unidentifiable coils at the warehouse
12Commercial termsIncoterms, destination port, lead time, payment termsPrices that cannot be compared at all

Field 2 and field 9 interact with other pages in this cluster: coating designations are decoded in the ASTM A463 guide, while price structure, MOQ and lead time economics are covered separately in the price-per-ton analysis.

Fields 1–3: standard, coating and grade

These three lines define the material.

Standard and type

State the standard and the type on the same line — "ASTM A463 Type 1" — because Type 1 (Al-Si, approximately 91% Al / 9% Si) and Type 2 (commercially pure aluminium) are different products with different purposes. Cleveland-Cliffs' Type 1 data sheet gives a service limit of 1250 °F / 677 °C and heat reflectance of up to 80% below 800 °F / 427 °C; both figures are conditional and should be quoted with their conditions. [Source: Cleveland-Cliffs, ALUMINIZED TYPE 1 STEEL, 2025-03; ASTM A463]

Coating designation

Then state the coating designation in full. The T1 series listed in that data sheet runs from T1 13 to T1 60, with T1 25 and T1 40 commonly specified. Do not substitute an AS code for a T1 code without a documented cross-reference confirmed on the mill certificate.

Base grade and forming

Finally, describe the forming operation. A grade that is right for a flat heat shield may be wrong for a deep-drawn oven component.

Fields 4–8: dimensions, geometry and surface

Dimensions and coil geometry

Write thickness, width and their tolerances with units, and say whether the thickness is the substrate or the coated product. Coil ID/OD and maximum coil weight are the fields most often forgotten by first-time importers — and the most expensive to discover at the decoiler.

Surface and edge condition

Surface and edge conditions matter more for aluminized steel than for galvanized sheet: the aluminium coating does not provide the same sacrificial protection at a cut edge as zinc does. Specify whether edges are mill or slit, the burr limit, and how cut edges are protected in transit. Our defect and inspection guide explains the cut-edge corrosion mechanism and the defect classes to reference in your inspection clause.

Fields 9–12: quantity, documents, packing and terms

State the tonnage, the MOQ you can accept and the ± tolerance on delivered quantity. Ask for the mill test certificate to carry the standard, type, coating designation and measured coating mass, plus heat number traceability. If the order is for a heat-exposed part, add third-party inspection covering coating mass and visual surface.

Packing is a specification, not a courtesy: seaworthy packing, coil orientation, rust-inhibiting protection and label content should be written into the PO. Finally, name the Incoterm, the destination port and the lead time — a "USD per ton" figure is meaningless without them. For a structured breakdown of what moves that number, see Aluminized Steel Price per Ton: Cost Drivers and MOQ.

Copy-ready RFQ template

Subject: RFQ — Aluminized Steel Coil — [ASTM A463 Type 1 / T1-40] — [tonnage]

1. Standard / Type:  ASTM A463 Type 1   ________
2. Coating:          T1-40, coating mass per MTC  ________
3. Base grade:       ________  Forming: [drawing / bending / stamping]
4. Thickness:        ________ mm, tolerance ________, basis [substrate / total]
5. Width:            ________ mm, tolerance ________
6. Coil:             ID ________ mm / OD ________ mm / max ________ t
7. Surface:          ________
8. Edge:             [mill / slit], burr limit ________
9. Quantity:         ________ t, MOQ ________, tolerance ±________%
10. Documents:       MTC ________, coating mass stated, 3rd-party [yes/no]
11. Packing:         Export seaworthy, ________
12. Terms:           Incoterm ________, port ________, lead time ________, payment ________

Please confirm: coating designation availability, sample lead time, and MTC sample.

Note: this template is deliberately free of invented numbers. Every field must be filled from MESCO's verified offer sheet before the article is published.

How this checklist fits your buying process

Use the 12 fields at three points: when you request the first quotation, when you approve the proforma invoice, and when you check the mill certificate against the shipped lot. Keeping one specification sheet across all three steps is the simplest way to avoid the "we agreed on T1-40 but received T1-25" conversation. For a wider material reference, start from the Aluminized Steel pillar page.

Frequently asked questions

What is the minimum information needed for a usable quotation?

At minimum: standard and type, coating designation, base grade, thickness and width with tolerances, quantity and Incoterm. The other six fields are what make the quotation comparable and enforceable.

Should I state an AS code or a T1 designation?

State whichever system your drawing and inspection documents use, and do not mix them. ASTM A463 T1 codes and EN / mill AS codes are not interchangeable without a documented cross-reference.

Why does the edge condition need to be specified?

A slit edge exposes bare steel. Unlike zinc, the aluminium coating does not offer the same sacrificial cut-edge protection, so edge condition and protection affect service life.

Do I need a third-party inspection for every order?

Not for every order, but it is worth specifying when the coating mass is performance-critical. Ask for the coating mass to be stated on the MTC in all cases.

Can I compare two "USD per ton" quotes directly?

Only if the Incoterm, destination port, coating designation, packing and inspection scope are the same. Otherwise the cheaper quote is usually the one with fewer included items.

Is there a downloadable version of this checklist?

Get a specification sheet, not just a price

Send us the twelve fields and we will return a matching specification sheet, a sample and a mill test certificate. Request a free sample and MTC — mesco@mescogroup.com.cn.

Get Free & Quality Online Consultation

Send us some details about your needs and feel free to ask any questionss. Our sales team will get back to you via email within a day.

Contact us for free modeling
Just fill-in the form below and we will response to you within 12 hours.
*Email
Phone
*Title
*Content
Upload
  • Only supports .rar/.zip/.jpg/.png/.gif/.doc/.xls/.pdf, maximum 20MB.
To be a Respected China Coating Steel Supplier
Dalian Mesco Steel Co. Ltd.,